Back to ManufactINSManufactINS

Use case · Production planners

Re-sequence the moment reality changes — and keep the promised dates.

Sequences orders against real capacity, changeovers and material on hand, and re-plans when a machine or delivery slips.

The operating challenge

A plan built in a spreadsheet breaks on contact with the floor.

How the product fits

Sequence against live capacity and materials; re-plan on disruption.

How the workflow runs

  1. 1

    Connect the MES and material availability

  2. 2

    Sequence orders against capacity and changeovers

  3. 3

    Re-plan when a machine or delivery slips

  4. 4

    Publish the updated schedule to the floor

Operational outcomes

  • More on-time orders
  • Fewer changeover losses
  • Higher utilization

Information and systems used

  • MES / orders
  • Capacity & changeover data
  • Material availability

Enterprise controls built in

The use case inherits the same deployment, permission and audit model as the product.

  • Only reversible steps run on their own, inside limits you set; anything contractual, financial, safety-critical or touching the product waits for a named person.
  • Every recommendation shows its evidence and its owner.
  • Cloud, on-premises or hybrid, with residency and processing documented in a data-flow diagram for your review.

See this use case on your own process and data.

We will scope the workflow, sources, controls and success measure before proposing a pilot.

Book a 30-minute tailored demo